BIM Integrated As-Built Modeling Minimizing Errors in Construction: Tejjy Inc. BIM Consultants

BIM Integrated As-Built Modeling Minimizing Errors in Construction: Tejjy Inc. BIM Consultants
bim-integrated-as-built-modeling-minimizing-errors-in-construction-tejjy-inc-bim-consultantsBIM & As-Built Model help to get all information during the construction phase, eliminating inaccuracies in the construction documentation process.



We don't regard a model to be an as-built model until it's not verified. Hence, we upgrade it from LOD 400 to LOD 500, as per the requirement of the construction site.”— Sukh SinghWASHINGTON DC, DISTRICT OF COLUMBIA , USA, September 3, 2021 /EINPresswire.com/ -- Integrating as-built and BIM techniques, AEC industries have reduced 6% errors in construction activities, compared to the outdated pen-and-paper design and drafting solution. As-Built modeling and documentation enable easy capture of changes during the project, minimizing rework, leading to accurate and flawless construction documentation.



Tejjy Inc BIM Consultants in USA have implemented BIM As-Built solutions in their construction projects and have successfully eliminated rework and delay in their project delivery. The collaborated technique of the BIM & As-Built Model has helped the BIM company to get all information during the construction phase, thus eliminating flaws and inaccuracies in the construction documentation.
https://www.civilengineering.ai/bim-integrated-as-built-modeling-minimizing-errors-in-construction-tejjy-inc-bim-consultants/

Share this:

Post a Comment

 
Copyright © Ai4civilengineering